Radiant Global Logistics
Seamless Integration, Proven Performance.
One unified design-build solution.
Orion Construction delivered a 104,400 sq. ft. design-build facility for Radiant Global Logistics in Campbell Heights, Surrey, combining base building and tenant improvement (TI) under a single contract. This integrated approach streamlined delivery, eliminated hand-off risks, and gave Radiant a hub tailored to the demands of complex global distribution.
Base Building + TI, Seamlessly Delivered
Radiant’s new facility required both a Tier 1 distribution-ready base building and a custom TI for warehouse, office, and mezzanine functions. With Orion managing the full scope, the project benefited from single-source accountability and a fully coordinated delivery.
A standout feature was the installation of sliding container doors in the office, an innovative design choice that reflected Radiant’s logistics identity while enhancing functionality.
Agility Under Pressure: Challenges & Solutions
- Integration Risk: Coordinated base building (9 units) and TI scopes seamlessly, avoiding costly delays.
- Operational Standards: Delivered airtight, pest-free warehouse conditions, essential for global distribution.
- Unique Design Needs: Incorporated sliding container doors without compromising function.
- Tight Timeline: Delivered the full scope on schedule, ensuring Radiant could occupy and operate as planned.
Results That Matter
104,400 sq. ft. delivered seamlessly under one contract
$515K TI completed on budget
2-month TI duration, schedule met without overruns
Zero disruptions between base building and TI handover
Positive owner feedback on Orion’s seamless coordination
Where logistics meets design, Orion’s integrated delivery turned complexity into clarity, setting a new benchmark for tenant improvements in Campbell Heights.