Impera
Leading the Way in Density Optimization, Design Ingenuity, and Financial Success
The Impera Multi-Family Development showcases Orion Construction’s expertise in delivering high-density, cost-efficient projects. By leveraging Building Information Modelling (BIM), Orion’s team successfully transformed a 109-unit project into a 131-unit development, enhancing both profitability and site utilization. The project is a testament to Orion’s ability to combine design ingenuity with cost efficiency, ensuring exceptional results while meeting market demands and regulatory requirements.
BIM played a pivotal role in the success of the Impera project, streamlining the design process, maximizing density, and reducing costs. Orion’s team used BIM to generate nine different design options, analyzing each for maximized saleable area, parking efficiency, and unit density. By simulating these configurations early, the team pinpointed the optimal design, which increased both the Floor Space Ratio (FSR) and unit count while cutting construction costs and preventing foreseeable issues. This proactive approach exemplifies Orion’s commitment to maximizing site potential and delivering high-quality, profitable developments.
Optimize space and resources by analyzing configurations in detail.
Saving time and reducing costs early by catching conflicts and identifying inefficiencies in the design.
Maintain design flexibility while ensuring compliance with local regulations.
Key Stats Highlighting the Project’s Improvements
- Unit Increase: 109 to 131 units +20% Improvement
- FSR Increase: 3.0 to 3.55 +18% Improvement
- Floor Area: 92,013 sq ft to 108,927 sq ft. +18% Improvement
- Cost Savings: Orion’s redesign reduced costs by 2.34%, significantly enhancing the project’s overall profitability.