ML-Truck Equipment

Advanced Industrial Built-to-Suit Delivery — Fast, Integrated, Seamless.

Orion Construction delivered a fully customized 18,000 sq. ft. Built-to-Suit headquarters for ML-Truck Equipment, the authorized BC dealer for HIAB articulating cranes, Moffett truck-mounted forklifts, and Multilift hooklifts. The facility features a 7-bay repair garage, offices, mezzanine space, and comprehensive amenities, including a lunchroom, boardroom, washrooms, and a first aid room. A key highlight is the advanced 2-crane rail system, designed for seamless horizontal and vertical movement, supporting operational efficiency and future flexibility.

Key Execution Highlights

Integrated Delivery: Orion managed preconstruction, design-assist, base building construction, and tenant improvements under a single contract, accelerating occupancy and reducing transitional downtime.

Efficient Scheduling: Delivered two months ahead of schedule by strategically overlapping trades and pre-ordering critical equipment, including early procurement of electrical components to mitigate BC Hydro energization risks.

Complex Site Coordination: Navigated significant offsite service upgrades, including two new lock block retaining walls, and coordinated access along a narrow residential road.

Client-Driven Priorities: Enabled a seamless transition of the client’s existing crane system by installing a new crane rail ahead of relocation, supporting immediate operational readiness.

Outcomes & Client Value

  • Zero client deficiencies at turnover through proactive internal walk-throughs and trade accountability.
  • Maintained strict budget control with real-time invoice tracking and detailed cost-to-complete monitoring.
  • Strong positive feedback from the owner and building manager, affirming Orion as their first choice for future projects.

The ML-Truck Equipment project demonstrates Orion’s ability to integrate complex systems and deliver specialized industrial facilities with precision and speed. The project exemplifies our commitment to client-focused solutions, schedule certainty, and high-quality execution.

“Strong coordination and disciplined site management resulted in an accelerated build…“ – George Peles, ML-Truck Equipment.